Customization: | Available |
---|---|
After-sales Service: | on Line |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | Unit | MTMINIK | MT-60K | MT-80K | MT-150K | MT-200K | MT-300K |
Overall length | mm | 388 | 534-545 | 600 | 765 | 924-944 | 983-1050 |
Overall height | mm | 246 | 307 | 310 | 388 | 492 | 574 |
Overall width | mm | 175 | 258-263 | 270-280 | 353-436 | 449-483 | 543-568 |
pin to pin center distance | mm | 80-150 | 230-270 | 290-360 | 380-420 | 460-480 | 473-540 |
Forearm open width | mm | 80-140 | 155-170 | 180-200 | 232-315 | 306-340 | 375-411 |
Top to bottom pin distance | mm | 159 | 195 | 195 | 220 | 275 | 300 |
Pin diameter | mm | 25-40 | 45-50 | 50-55 | 60-70 | 70-80 | 80-90 |
Weight | kg | 25 | 50-60 | 80 | 120-130 | 280-290 | 420-430 |
Working pressure | kg/cm2 | 40-380 | 40-380 | 40-380 | 40-380 | 40-380 | 40-380 |
Required oil Flow | L/min | 10-20 | 10-20 | 10-20 | 10-20 | 10-20 | 10-20 |
Suitable Excavator | Ton | 1.5-4 | 4-7 | 5-8 | 9-19 | 17-23 | 23-30 |
Spec | Traditional excavator | Install quick coupling excavator | Advantages |
Staff | At least two staffs | One Driver | Save Human Resources |
Replacement Tools | Wrench, Hammer, Iron pipe, Pliers etc | Don't need | Simple Operation, reducing labor intensity |
Replacement time | half hour to one hour | within one minute | Fast replacement time, reducing downtime |
Diesel consumption | 6-8L(replace once) | 0.5L | Reduce fuel consumption |
Max. replacements | 5-6 times/day | 100 times/ day | Can be replaced multiple times |
Operating conditions | Flat ground | Unlimited | Low working condition requirement |
Driver proficiency | Skilled | Average level | Low staff requirements |
Safety incident | Minor accidents often occur due to use sledgehammer to strike | Zero accident due to driver can work in the cab with switch | Ensure staff safety |
Packing | 1.Wood/Paper Case Packing, pallet, protect film, sheet belt. |
2.OEM packing in accordance with customers' requirement. | |
Shipping | 1.By sea Tianjin port for big amount around 15-30days. |
2.By Express(DHL,UPS,TNT) for small amount around 3-7days. | |
Payment | 1.Small and trial order 100% full payment. |
2.Big order by 30% TT in advance and 70% against the BL. |